The Eichinger Column Skip is a heavy-duty concrete pouring skip built for precise, controlled delivery of concrete on construction sites. Whether you’re filling columns, walls, pile caps, foundations or floor slabs, this concrete pouring skip gives you accurate placement without waste, mess or the need for additional labour.
The flexible, easy-to-direct delivery hose allows operatives to guide the concrete flow precisely into formwork or shuttering, reducing spillage and improving accuracy even in confined or awkward positions. The gate-closing pulley system gives the operator full control over the flow rate, allowing concrete to be released gradually and cleanly – critical for structural pours where consistency matters.
When the pour is complete, the kick-down hopper design makes cleaning fast and straightforward, minimising residue build-up and keeping downtime between uses to a minimum.
Available in 500, 1000, 1500 and 2000 litre capacities, there is a concrete skip to suit every scale of project – from small groundworks pours through to large commercial or civil engineering concrete placements. Lifted by crane or telehandler via the integrated lifting frame.
- Concrete pouring skip available in 500, 1000, 1500 and 2000 litre capacities
- Flexible delivery hose for accurate, directed concrete placement
- Gate-closing pulley for precise control of concrete flow rate
- Kick-down hopper for fast, easy cleaning between pours
- Suitable for columns, walls, pile caps, foundations and floor slabs
- Compatible with cranes and telehandlers
- Reduces spillage and waste during concrete placement
- Heavy-duty steel construction for intensive site use